Mezzanine Floor Design & Installation

Got a drawing or idea? Let’s make it real.
βœ” Single & multi-tier systems

βœ” CE/UKCA marked structural steel

βœ” Full drawings, calcs & RAMS

βœ” Fast turnaround, nationwide install

Plan. Engineer. Install.

Plan. Engineer. Install.

We handle survey, design, fabrication, and installation. Load-bearing columns, beams, and decking specified to your usage and local building control requirements.

Frequently Asked Questions

How long does a typical install take?

Most single-tier systems install in 2–5 days, depending on size and access.

Do you provide calculations?

Yes. Structural calcs and GA drawings are included for building control approval.