Amazon Fulfilment Centre - Multi-Tier Mezzanine

≈1,200 m² multi-tier mezzanine with 5.0 kN/m² UDL, compliant access, pallet gates and integrated fire strategy.

Client: Amazon (3PL partner)Location: UK Fulfilment CentreValue: £850kProgramme: 7 weeks on siteCompleted: March 2025
  • Multi-tier mezzanine (~1,200 m²) with 5.0 kN/m² UDL
  • Access & escape stairs, pallet gates, edge protection
  • Conveyor/M&E penetrations coordinated
  • Fire strategy incl. column encasement & bulkheads
Area Added
≈1,200 m²
UDL
5.0 kN/m²
Staircases
4
Pallet Gates
6
Multi-tier mezzanine with stairs, pallet gates and fire protection at Amazon FC
s

Key Features

Engineered for Throughput

Column grid and beam sizing optimised around pick routes.

Fast Programme

Off-site fabrication + JIT deliveries.

Compliance Built-In

SE-signed calcs, RAMS, O&M, and building control liaison.

Scope & Objectives

Increase storage density and throughput without expanding the footprint; integrate with racking and MHE while maintaining egress.

Scope & Objectives

Engineering & Coordination

Penetrations planned for conveyors, sprinklers and cabling. Columns/bracing modelled to keep FLT clearances and escape widths.

Engineering & Coordination

Install & Handover

Night works limited disruption. Issued O&M, as-builts and certification on completion.

Install & Handover

Project FAQs

Did works run during operations?

Yes - night shifts and segregated zones kept lines running.

Who handled building control?

We provided drawings, calcs and liaised directly to sign-off.